One of the two ash pan hopper doors. |
The oval hole cut in the running plate for the brake pipework to pass through. |
Progress on the mechanism for one of the three damper doors. |
Fitting the first of the insulation, to the left hand side cylinder. |
Fitting the first of the insulation, to the left hand side cylinder. |
Fitting the first of the insulation, to the left hand side cylinder block. |
The ash pan damper door operating levers re-fitted. |
Fitting the blast pipe mounting studs to the saddle. |