One of the connectors for the water feed pipes between tender and locomotive. |
One of the new oil pot covers for the con rods. |
The new pipe running from the steam chest to the middle of the three drain cocks. |
The new water feed trays. These fit into the top of the boiler barrel. The top feed water runs along the trays, distributing the cold water and reducing the thermal shock. |