Cotswold Steam Preservation Ltd Images - GWR No. 2807
September 2008 Restoration Progress
1st September 2008 to 30th September 2008
<-- Index | Showing 1-11 of 11 pictures | Index -->
The various seals and packings on the piston rod.
The various seals and packings on the piston rod.
The superheater header blanking plates.
The superheater header blanking plates.
The left hand side injector in position.
The left hand side injector in position.
The vacuum pipe leading up towards the boiler backhead.
The vacuum pipe leading up towards the boiler backhead.
Fittint the superheater header top blanking plates.
Fittint the superheater header top blanking plates.
Working in cramped conditions between the frames amongst the motion rods.
Working in cramped conditions between the frames amongst the motion rods.
The main part of the superheater header blanking plating fitted.
The main part of the superheater header blanking plating fitted.
Drilling out the old studs.
Drilling out the old studs.
The old studs are drilled out, the remains of the thread picked out, and the hole re-tapped.
The old studs are drilled out, the remains of the thread picked out, and the hole re-tapped.
The steam heat pipe bracket attached to the frame stretcher.
The steam heat pipe bracket attached to the frame stretcher.
Grinding the surface ready for the last of the blanking plates.
Grinding the surface ready for the last of the blanking plates.