Cotswold Steam Preservation Ltd Images - GWR No. 2807
March 2009 Restoration Progress
1st March 2009 to 31st March 2009
<-- Index | Showing 1-11 of 11 pictures | Index -->
The old pony truck pin.
The old pony truck pin.
Boiler cladding parts and top feed pipework.
Boiler cladding parts and top feed pipework.
The top feed pipe cladding.
The top feed pipe cladding.
The new pony truck pin in place.
The new pony truck pin in place.
The front bracket which attaches the ash pan to the boiler. The brackets will be welded into place when adjusted.
The front bracket which attaches the ash pan to the boiler. The brackets will be welded into place when adjusted.
The superheater header virtually ready for hydraulic test.
The superheater header virtually ready for hydraulic test.
Finalising the pipework connections.
Finalising the pipework connections.
Working underneath the chassis to fit the remaining parts of the ash pan hopper door operating mechanism.
Working underneath the chassis to fit the remaining parts of the ash pan hopper door operating mechanism.
Hopper doors closed ...
Hopper doors closed ...
... hopper doors open.
... hopper doors open.
Removing the ash pan so that the remaining parts can be fitted.
Removing the ash pan so that the remaining parts can be fitted.