Cotswold Steam Preservation Ltd Images - GWR No. 2807
Boiler cladding, sheets temporarily fitted. |
The Llangollen staff have started cleaning up the pads for the backhead fittings. |
A view of the smokebox tubeplate. Note the main steam pipe. |
Fitting the retaining band for the rear barrel cladding sheet. |
A new cladding piece, which fits to the lower part of the throat plate. |
A new cladding piece, which fits to the lower part of the throat plate. |
Llangollen staff working on the pads for the backhead fittings. |
The right hand side valve motion connected up. Note also the piston rod lubrication. |
The new cladding part temporarily fitted. |
Close up of one of the washout plug accesses. |
The washout plug access seen from the other side of the cladding sheet. |
Some of the boiler tubes awaiting fitting. |
Note the bottle ends on the tubes. |
The remainder of the tubes. |
Studs fitted into the backhead. |
The new cladding part approaching completion. |
A view showing how the cladding fits around the safety valves. |
A view showing how the top of each barrel cladding sheet is fixed. |
Access for one of the washout doors. This will be covered by a domed cover. |
A view through the smokebox tubeplate. The longitudinal stays are just visible. |
Cutting the hole for one of the washout plug accesses. |
The hole with its ferrule fitted. |
The completed new cladding part. |
The backhead almost ready to receive gauges and controls. |
The cladding on the firebox, showing the 9 accesses to the washout plugs. |
Fitting the cladding sheet straps. |
Fitting the new cladding piece. |
Test fitting the 'elephant ear'. |
Test fitting the 'elephant ear'. |
Test fitting the 'elephant ear'. |
The new cladding piece in position. |
The water gauge partially fitted. |
Some backhead gauges and controls fitted. |
Some backhead gauges and controls fitted. |
Some backhead gauges and controls fitted. |
The new firebox baffle plate. |
Adjusting the tender ride height. |
Jacking up the tender to adjust the springs. |
The superheater header has been machined. |
Boiler tubes marked with some of their sponsor's names. |
The firebox tubeplate showing the flue tubes fully fitted, and some of the small tubes in position awaiting final fitting. |
One of the covers over the washout access holes. |
Creating the chamfer, ready for welding, on the top part of the weyshaft bracket, seen upside down on the bench. |
Needle gunning the tender left hand side front to remove loose paint. |
Angle grinding the weyshaft bracket and new tender rear lamp bracket. |
Needle gunning the tender left hand side front to remove loose paint. |
Assembling the vacuum pump. |
Wiring up the TPO. |
The tender left hand side front ready for painting. |
The weyshaft bracket showing the new metal strip inserted and with edges prepared for welding. |
The tender left hand side front painted. |
The superheater header, now at Llangollen, with some of the new studs in place. |
All tubes in the boiler but not all expanded into the tube plate. |
Some of the new firebars. |
The new lamp bracket on the centre rear of the tender. |
New whistle chain guides, compare with an original. |
| | | |